Below is our Basic Aircraft Performance Database which allows you to view the aircraft performance information on over 1,200 aircraft one aircraft at a time.
TBM 700
Operating Costs Per Hour | ||
---|---|---|
Fuel Cost Per Hour | $ 166.95 | |
Oil Cost Per Hour | $ 2.00 | |
Engine Reserve Per Hour |
| |
Prop Reserve Per Hour | 16.59 | |
Total Variable Cost Per Hour | $ 168.95 |
Other Related Information | ||
---|---|---|
Fuel Cost Per Gallon | $ 4.89 | |
Fuel Type | Jet-A | |
Average Engine Cost |
| |
Average Prop Cost | 49,768.00 | |
Engine Manufacturer | Updating Information – More info may be available if you are logged in from the search & Compare pages |