Below is our Basic Aircraft Performance Database which allows you to view the aircraft performance information on over 1,200 aircraft one aircraft at a time.
KATANA DA20-A1
Operating Costs Per Hour | |
---|---|
Fuel Cost Per Hour | $ 23.95 |
Oil Cost Per Hour | $ 2.00 |
Engine Reserve Per Hour | |
Prop Reserve Per Hour | |
Total Variable Cost Per Hour |
Other Related Information | |
---|---|
Fuel Cost Per Gallon | |
Fuel Type | |
Average Engine Cost | |
Average Prop Cost | |
Engine Manufacturer |