Below is our Basic Aircraft Performance Database which allows you to view the aircraft performance information on over 1,200 aircraft one aircraft at a time.
36 A36 BONANZA ’75
Operating Costs Per Hour | |
---|---|
Fuel Cost Per Hour | $ 96.85 |
Oil Cost Per Hour | $ 2.00 |
Engine Reserve Per Hour | 19.27 |
Prop Reserve Per Hour | 4.78 |
Total Variable Cost Per Hour | $ 118.12 |
Other Related Information | |
---|---|
Fuel Cost Per Gallon | $ 5.43 |
Fuel Type | 100LL |
Average Engine Cost | 32,759.00 |
Average Prop Cost | 8,125.00 |
Engine Manufacturer | Continental |