Below is our Basic Aircraft Performance Database which allows you to view the aircraft performance information on over 1,200 aircraft one aircraft at a time.
KING AIR 90 E90
Operating Costs Per Hour | |
---|---|
Fuel Cost Per Hour | $ 422.25 |
Oil Cost Per Hour | $ 4.00 |
Engine Reserve Per Hour | 230.00 |
Prop Reserve Per Hour | 16.34 |
Total Variable Cost Per Hour | $ 656.25 |
Other Related Information | |
---|---|
Fuel Cost Per Gallon | $ 4.89 |
Fuel Type | Jet-A |
Average Engine Cost | 402,500.00 |
Average Prop Cost | 28,592.00 |
Engine Manufacturer | Pratt & Whitney |