Below is our Basic Aircraft Performance Database which allows you to view the aircraft performance information on over 1,200 aircraft one aircraft at a time.
500B
Operating Costs Per Hour | ||
---|---|---|
Fuel Cost Per Hour | $ 167.47 | |
Oil Cost Per Hour | $ 4.00 | |
Engine Reserve Per Hour |
| |
Prop Reserve Per Hour |
| |
Total Variable Cost Per Hour | $ 171.47 |
Other Related Information | ||
---|---|---|
Fuel Cost Per Gallon | $ 5.43 | |
Fuel Type | 100LL | |
Average Engine Cost |
| |
Average Prop Cost |
| |
Engine Manufacturer |
|